Kentucky Lock
Navigation Model
A 1:100 scale
Navigation Model was constructed at the Waterways Experiment Station
in Vicksburg, MS to investigate navigation conditions in the lower
lock approach for a distance of two miles downstream of the dam.
Construction of the model was completed in April 1999. The model
includes a scaled version of the spillway, powerhouse and existing
lock. Currently, base or existing conditions testing is ongoing.
This information will be used as a comparison to conditions after
the 1200’ Lock addition is in place. In addition to navigation,
the model will be used to evaluate several environmental issues
associated with the new lock and required railroad and highway
bridge relocations. |
image10.jpg
(129010 bytes) |
Image
#10: Click on thumbnail
view to view larger image
Scale model of the new Lock prior
to insertion in the Navigation Model. Downstream face of Lock in the foreground.
|
image11.jpg
(147663 bytes) |
Image
#11:
Crews at WES prepare the Navigation
Model for the new Lock by removing the existing topography and templates were the structure
will be placed.
|
image12.jpg
(74243 bytes) |
Image
#12:
View looking upstream toward
the new Lock after insertion in the
Navigation Model. The downstream guidewall was recently
completed and inserted in the model as well.
|
C9905-04.jpg
(460159 bytes) |
Picture # 9905-04:
View looking upstream
toward Kentucky Lock and Dam from a point approximately one mile
downstream of I-24(prototype scale or fifty feet in the model
scale). The color scheme is as follows: blue ranges from streambed
up to elevation 302, yellow from 302 to 344 and green above 344.
|
|

C9905-05.jpg
(651419 bytes) |
Picture #9905-05:
View looking
downstream from above the headbay, showing the original upstream
cofferdam and old railroad coffer cells downstream of the dam. Model
duplicates approximately two miles of the Tennessee River. |
 |
Downstream
Cofferdam under construction |
 |
Downstream
Cofferdam under construction |
 |
Downstream
Cofferdam under construction |
 |
Downstream
Cofferdam under construction |
 |
Downstream
Cofferdam under construction |