 WES Navigation Model

Kentucky Lock Navigation Model

A 1:100 scale Navigation Model was constructed at the Waterways Experiment Station in Vicksburg, MS to investigate navigation conditions in the lower lock approach for a distance of two miles downstream of the dam. Construction of the model was completed in April 1999. The model includes a scaled version of the spillway, powerhouse and existing lock. Currently, base or existing conditions testing is ongoing. This information will be used as a comparison to conditions after the 1200’ Lock addition is in place. In addition to navigation, the model will be used to evaluate several environmental issues associated with the new lock and required railroad and highway bridge relocations.

image10.jpg (129010 bytes)

image10.jpg 
(129010 bytes)

Image #10: Click on thumbnail view to view larger image

Scale model of the new Lock prior to insertion in the Navigation Model. Downstream face of Lock in the foreground.

image11.jpg (147663 bytes)

image11.jpg 
(147663 bytes)

Image #11:

Crews at WES prepare the Navigation Model for the new Lock by removing the existing topography and templates were the structure will be placed.

image12.jpg (74243 bytes)

image12.jpg 
(74243 bytes)

Image #12:

View looking upstream toward the new Lock after insertion in the
Navigation Model.  The downstream guidewall was recently completed and inserted in the model as well.

C9905-04.jpg (460159 bytes)

C9905-04.jpg 
(460159 bytes)

Picture # 9905-04:  

View looking upstream toward Kentucky Lock and Dam from a point approximately one mile downstream of I-24(prototype scale or fifty feet in the model scale). The color scheme is as follows: blue ranges from streambed up to elevation 302, yellow from 302 to 344 and green above 344.

C9905-05.jpg (651419 bytes)

C9905-05.jpg 
(651419 bytes)

Picture #9905-05:

View looking downstream from above the headbay, showing the original upstream cofferdam and old railroad coffer cells downstream of the dam. Model duplicates approximately two miles of the Tennessee River.

MVC-001F.jpg (208258 bytes) Downstream Cofferdam under construction
MVC-003F.JPG (238299 bytes) Downstream Cofferdam under construction
MVC-004F.JPG (192254 bytes) Downstream Cofferdam under construction
SEG1-1.jpg (164527 bytes) Downstream Cofferdam under construction
SEG1-2.jpg (157560 bytes) Downstream Cofferdam under construction
The Point of Contact for this page:

Project Manager
Ben Rohrbach
(615) 736-5631


Points of Contact: 

Questions about this page:

Project Manager - Don Getty (615) 736-2346

Public Affairs - Public Affairs Officer (615) 736-7161

Questions about this website:
Webmaster


Page Last Updated:
27 July 2011

Privacy and Security Notice
Information Quality Act (IQA)
Freedom of Information Act (FOIA)
Disclaimer